Counties: Fort Bend,
Harris, Waller
Parameter: Bacteria
River Basin: San Jacinto River
Segments: 1013, 1014, 1017
 |
|
Buffalo Bayou
|
Background and
Goals
Buffalo Bayou meanders from the outlying, less-developed
portions of Harris County to join Whiteoak Bayou in the highly
urbanized central part of the Houston business district. Both
bayous lie within the San Jacinto River Basin and eventually
discharge to Galveston Bay.
Water quality testing found that bacteria concentrations are
elevated in the bayous, posing a risk to people who swim or wade in
them. Swimming and wading are called contact recreation
in the states standards for water quality; the term refers to
all recreation in which people come in direct contact with the
water.
The TMDL Program is working with the Houston-Galveston
Area Council
to characterize the sources of bacteria and
to develop a plan to improve the water quality in the bayous. The
goal of the project is to reduce bacteria concentrations to within
acceptable risk levels for contact recreation. The TMDLs for this
project are being coordinated with other projects to reduce
bacteria in Houston area streams and the Galveston Bay system (see
Related Links).
Return to top
Proposed TMDLs
Commission consideration of these
TMDLs was postponed until December 10th, 2008, due to extensive
damage to the Houston area from Hurricane Ike. The TCEQ is
currently revising the TMDL report; the updated draft will be
available on the Web prior to the commission’s December 10th
meeting.
Return to top
Public
Participation
An advisory
group has been established advise the TCEQ on this project.
Advisory group meetings are open to all. Find
out more about meetings and membership of the advisory
group.
Meetings about TMDL projects are open to everyone.
Return to top
Bacteria
Implementation Group
The TCEQ is working with the Bacteria
Implementation Group (BIG)
of the H-GAC to develop a plan to reduce
bacteria concentrations in 12 watersheds in the Houston area,
including the projects for Lake Houston, Clear Creek, the Houston
Metropolitan Area, and this project.
Project Documents
The following documents are available in PDF. Help with PDF.
-
Ground Rules
As proposed for amendment at stakeholder meeting of January 28,
2004.
- Reports
Return to top
For More Information
For additional information regarding the advisory group, contact
Earlene Lambeth at 512/239-3129. For technical information about
this project, contact Ron Stein at 512/239-4507. Or e-mail us at tmdl@tceq.state.tx.us, and
reference the Buffalo Bayou TMDL Project in the subject line.
Return to top