Texas Pollutant Discharge Elimination System (TPDES) General
Permit No. TXG110000 was renewed and issued on November 7, 2006. A
copy of the issued
general permit (PDF), supporting
fact sheet and Executive Director's preliminary decision (PDF)
and
response to comments (PDF) are available for you review. If you
discharge facility wastewater and/or storm water from a concrete
production facility, you may qualify for coverage under this
general permit. Please review the permit to determine if it applies
to your facility. If yes, submit a notice
of intent (with instructions) (NOI) (PDF) and application fee
to the address provided on the NOI. (Help with PDF.)
After obtaining coverage under this permit, you will need to do
the following:
-
Adhere to the requirements of the general permit (TXG110000) (PDF).
(Help with PDF).
-
Complete and submit the Discharge Monitoring Report Form
(3320-1), as required.
-
If the owner or operator changes, the present owner and operator
must submit a
Notice of Termination (NOT) (PDF) and the new owner and
operator must submit an NOI.
-
If the discharge becomes unnecessary, is delayed or is
completed, the permittee may voluntarily terminate coverage by
submitting an NOT.
-
If you are discharging to an MS4 (HTML), you must submit a
copy of the following to the operator of that system at the same
time you submit them to the TCEQ:
-
Notice of Intent (NOI)
-
Notice of Termination
The permit is in effect until the NOT is submitted. Fees will
accrue annually on September 1.
Even if the general permit described above applies to your
situation, you may request coverage under an individual permit
(HTML).
Contact us if you have
questions.